Case Studies
Field Records, Published After Client Clearance
Professional clients operate under confidentiality. We publish deployment records — mission profile, configuration and measured outcomes — only after client clearance. The first three records are in preparation:
Case 01 — Pipeline corridor patrol
Extended-endurance hydrogen multi-rotor, ~200 km of corridor per cycle. Status: client clearance in progress.
Case 02 — Border section surveillance
Heavy VTOL + ground-station link, 150 km control radius. Status: in preparation.
Case 03 — Emergency field power & comms
Silent hydrogen generators supporting a drone team where no grid exists. Status: in preparation.
Need a reference before these are published? Ask us in the RFQ — we arrange a direct call with the relevant engineering lead.